We demolished this single-story ranch-style home that was sitting on an overgrown lot with mature trees and overhead power lines. After coordinating utility disconnections and completing the required hazmat inspection, we cleared vegetation paths for equipment access and brought in the excavator for a clean mechanical tear-down of the modest wood-frame structure with vinyl siding. We separated recyclable materials like metal and wood from general debris, completed multiple haul-off runs to clear the site, removed the foundation, and finished with final grading that left the lot level, clean, and ready for whatever comes next—the whole job wrapped in 2-3 days, done right from start to finish.
Go to link